Natural Aptitude Career Planned CV
EDUCATION
- National Diploma
- Mechanical Drawing and Architectural Drawing
- National Diploma in Mechanical Engineering
- National Certificate in Project Management
- Certificate in Implementing ISO 9000:2000
- Six Sigma – Green Belt Certification
- B.Tech. in Industrial Engineering
- MBA, (PGCBA – Post Graduate Certificate for Business Administration)
CAREER
Position: Designer/Assistant Engineer (Process and Mechanical)
Responsibilities
- Analyzed data on a daily basis to improve, adapt or change the designs, enhanced the final optimized product, and conducted “What-if” analysis.
- Simulated different scenarios with a high level of detail to gather and process information and increase efficiency.
- Evaluated manufacturing techniques and processes to find solutions that would save time, energy and money and increase effectiveness.
- Drove projects to be completed within expected timeframe through constant questioning and brainstorming sessions and by making use of all the resources available.
- Took responsibility for engineering process calculation to be designed, manufacturing techniques and production.
- Maintained and improved standards and quality assurance.
- Achieved multiple innovative ideas and designs on technology and in manufacturing process.
- Increased the efficiency of research by designing and implementing a systematic work flow system.
- Increased design effectiveness through QCP and brainstorming.
- Increased communication and team work, resulting in higher standards and better results.
Position: Production Planner, Draughtsman
Responsibilities
- Acted as Production Planner for the company, from designing, project planning, and manufacturing to assembling, testing and commissioning.
- Took responsibility for Design Evaluation (make or buy), production planning and scheduling.
- Completed various projects within expected timeframes and with cost savings. This was accomplished by making use of workflow diagrams and prioritizing techniques. As a result, the workshop workload increased by about 20%.
- Reduced rework and scrap. Saved money and time by taking responsibility for improving and optimizing the manufacturing, design and planning processes. The costs saved were about 10-15% per project (budget).
- Reduced time and energy waste by implementing new equipment, as a result of work study performed. This resulted in more effective performances from staff.
- Conducted site visits for evaluation of maintenance, repairs and replacements on locomotives.
- Erected a 700 m2 stores building including design of stores layout, without influencing current projects and operations. Increased accurate stock control by 25%.
- Took responsibility for the drawing office; configuration, filing, designing, manufacturing and suppliers.