(for additional remarks use other side)
N
M
CR
CAT
Stoplogs or Gate
Guide slot
Log or gate body
Hoisting equipment
Preservation
Intake screen
______________________________Signature of Inspector
B-10
Inspection Checkoff List (cont'd)
Sheet No._______ of_______
Caisson No._____________________________________________
Degree of
Hazard
Remarks
Items Inspected
(for additional remarks use other side)
N
M
CR
CAT
Basic Structure
Shell plating
Structural framing
Bulkheads
Deck plating
Top dock covering
Fenders
Wood backing for gasket
Rubber gasket
Exterior preservation
Interior preservation
Ballast compartment preservation
General condition
Fittings
Portable guardrails
Hatches
Cleats, chocks
Steps, ladders, handrails
Gratings
Airports
_______________________________Signature of Inspector
B-11
Inspection Checkoff List (cont'd)
Sheet No._______ of_______
Caisson No._____________________________________________
Degree of
Hazard
Remarks
Items Inspected
(for additional remarks use other side)
N
M
CR
CAT
Compressed air piping
Compressed air container
valves
Inclinometers
Water level indicators
Lighting fixtures
Mechanical Equipment
Capstan no. 1
Capstan motor
Motor controller
Capstan no. 2
Capstan motor
Motor controller
Dewatering pump no. 1
Pump motor
Motor controller
Lubrication system
Foot valve
Discharge valve
Valve operator
Check valve
__________________________________Signature of Inspector
B-12
Inspection Checkoff List (cont'd)
Sheet No._______
of_______
Caisson No._____________________________________________
Degree of
Hazard
Remarks
Items Inspected
(for additional remarks use other side)
N
M
CR
CAT
Dewatering pump no. 2
Pump motor
Motor controller
Lubrication system
Foot valve
Discharge operator
Check valve
Trimming Pump No. 1
Pump motor
Motor controller
Discharge valve
Trimming Pump No. 2
Pump motor
Motor controller
Discharge valve
Flood Valves
Flood valve no. 1
Valve operator
Flood valve no. 2
Valve operator
_____________________________________Signature of Inspector
B-13
Inspection Checkoff List (cont'd)
Sheet No._______ of_______
Caisson No._____________________________________________
Degree of
Hazard
Remarks
Items Inspected
(for additional remarks use other side)
N
M
CR
CAT
Flood valve no. 3
Valve operator
Flood valve no. 4
Valve operator
Flood valve no. 5
Valve operator
Flood valve no. 6
Valve operator
Flood valve no. 7
Valve operator
Flood valve no. 8
Valve operator
Flood valve no. 9
Valve operator
Flood valve no. 10
Valve operator
Flood valve no. 11
Valve operator
Flood valve no. 12
Valve operator
___________________________________Signature of Inspector
B-14
Inspection Checkoff List (cont'd)
Sheet No.________
of________
Caisson No.________________________________________________
Degree of
Hazard
Remarks
Items Inspected
(for additional remarks use other side)
N
M
CR
CAT
Flood valve no. 13
Valve operator
Flood valve no. 14
Valve operator
Flood valve no. 15
Valve operator
Flood valve no. 16
Valve operator
Flood valve no. 17
Valve operator
Flood valve no. 18
Valve operator
Flood valve no. 19
Valve operator
Flood valve no. 20
Valve operator
Flood valve no. 21
Valve operator
Flood valve no. 22
Valve operator
___________________________________Signature of Inspector
B-15
Inspection Checkoff List (cont'd)
Sheet No.________
of________
Caisson No.______________________________________________
Degree of
Hazard
Remarks
Items Inspection
(for additional remarks use other side)
N
M
CR
CAT
Flood valve no. 23
Valve operator
Flood valve no. 24
Valve operator
Flooding valve no. 1
Valve operator
Flooding valve no. 2
Valve operator
Flooding valve no. 3
Valve operator
Flooding valve no. 4
Valve operator
Equalizing valve no. 1
Valve operator
Equalizing valve no. 2
Valve operator
Vent blower
Blower motor
Motor operator
Power leads (portable)
Transformers
Control panel
___________________________________Signature of Inspector
B-16
Table B-3. Coating Systems for Maintenance of Drydocking Facilities
Coating Designation and Minimum Dry Film Thickness (mils)
Total
Minimum
Type of Surface
Dry Film
and Exposure
Pretreatment
Thickness
Wash Primer
First Coat
Second
Third Coat
Fourth Coat
(mils)
Coat
Exterior steel; immersed
none
MIL-P-24441
MIL-P-24441
MIL-P-24441
none a
9
in or occasionally wetted
Formula 150
Formula 151
Formula 154
with seawater
(3)
(3)
(3)
Exterior steel; always
MIL-P-15328
TT-P-645
TT-P-645
MIL-E-15130
MIL-E-15130
5
dry
(0.3)
or
or
(1-1/2)
(1-1/2)
MIL-P-17545
MIL-P-17545
(1)
(1)
Interior steel other than
MIL-P-15328
TT-P-645
MIL-E-17970
MIL-E-17970
none
4
caissons or chambers;
(0.3)
(1)
or
or
occasionally flooded
MIL-E-17972
MIL-E-17972
with seawater
(1-1/2)
(1-1/2)
Interior of steel caisson
none
MIL-C-18480
MIL-C-18480
MIL-C-18480
none
40
or chamber; occasionally
(14)
(13)
(13)
flooded with seawater
Decks and treads
MIL-P-15328
TT-P645
MIL-P-18210
MIL-P-18210
none
4
(0.3)
(1)
(1-1/2)
(1-1/2)
Piping
Concrete and masonry
not painted
a Two coats of MIL-P-15931 applied at 4 mils (total) dry film thickness may retard attachment and growth of fouling organisms for 2 or more years, if fouling is a problem.
B-17
INDEX
Accelerator admixtures, concrete ....................... 3.1.2.4
Chocks
Admixtures (concrete), definition ........................ 3.1.2.4
Preservatives................................................ 2.1.4.9
Aggregate, definition .......................................... 3.1.2.2
Replacement ................................................ 2.3.1.6
Air-entraining admixtures, concrete .................... 3.1.2.4
Coal tar epoxy, protective coating (steel)............ 7.2.3
Aluminum alloys, steel substitute ....................... 7.4.1.4
Coal tar, protective coating (steel)...................... 7.2.3
Armor units, reinforced concrete ........................ 1.4.2.9
Coatings, concrete ............................................. 3.4.9
............................................................... 5.1.3
Compressed air distribution system, inspection.. 7.5.3.4.6
As-built drawings ............................................... 1.6.2
Compressive strength, concrete ......................... 3.1.3.2
Backing log, preservatives ................................. 2.1.4.8
Concrete
Bankia ............................................................... 2.1.2.2
Accelerated weathering................................. 3.2.1.2
Barges ............................................................... 1.7.2
Barrier (pile repair)........................................ 2.3.2.2.2
Barricades, safety .............................................. 1.8.3
Chemical attack............................................ 3.2.1.3
Beating piles
Cracks.......................................................... 3.2.2.1
Repair........................................................... 2.3.2.1
Curing .......................................................... 3.2.1.5
............................................................... 2.3.2.2
Curing temperature....................................... 3.1.4.3
Replacement ................................................ 2.3.1.1
Definition ...................................................... 3.1.1
Berthing ............................................................. 1.8.6
Deterioration................................................. 3.2.1
Biological corrosion............................................ 7.1.2
Diamond-drilled cores................................... 3.3.2
Bolt holes, preservatives .................................... 2.1.5
Dry-pack mortar repair.................................. 3.4.2
Braces
Durability ...................................................... 3.1.3.3
Repair (flexible polyvinyl chloride sheet)........ 2.3.2.3
Fiber-reinforced ............................................ 3.1.4.2
Replacement ................................................ 2.3.1.3
Finishing....................................................... 3.2.1.5
Breakwater ........................................................
High impedance voltmeter testing ................. 3.3.3
Definition ...................................................... 1.4.2.9
Mechanical damage...................................... 3.2.1.8
Structural damage (rubble-mound)................ 5.2.2.3
Normal weathering........................................ 3.2.1.1
Brown rot, timber ............................................... 2.1.2.1
Plastic shrinkage .......................................... 3.2.1.6
Bulkheads (wood), replacement ......................... 2.3.1.10
Prestressed .................................................. 3.1.4.1
Bullrails, preservatives. ...................................... 2.1.4.8
Protective coatings ....................................... 3.4.9
Caisson, entrance .............................................. 1.4.2.5.1
Repair .......................................................... 3.4
Cast-in-place concrete, repair method ................ 3.4.3
Cast-in-place method .............................. 3.4.3
Cathodic protection
Epoxy resin method ................................. 3.4.8
Definition ...................................................... 7.3.1
Prepacked concrete method .................... 3.4.5
Galvanic anode system................................. 7.3.2
Pumped method ...................................... 3.4.7
Impressed current system............................. 7.3.2
Shotcrete method .................................... 3.4.4
Catwalks, replacement....................................... 2.3.1.11
Tremie method ........................................ 3.4.6
Cement
Sonic testing................................................. 3.3.3
Definition ...................................................... 3.1.2.1
Spalls ........................................................... 3.2.2.2
Marine use.................................................... 3.1.2.1
Specialized ................................................... 3.1.4
Chelura.............................................................. 2.1.2.2
Strength........................................................ 3.1.3.2
Index-1
Concrete (continued)
Electrochemical oxidation .................................. 7.1.1
Structural settlement..................................... 3.2.1.7
Epoxy adhesives................................................ 8.1.5
Test hammer ................................................ 3.3.2
8.2.6
Ultrasonic testing .......................................... 3.3.3
Epoxy-polyamide, Protective coating (steel) ....... 7.2.3
Underwater ................................................... 3.1.4.3
Epoxy putties ..................................................... 8.1.5
Volume change............................................. 3.2.1.4
8.2.6
Water/cement ratio ....................................... 3.1.2.3
Epoxy resin, concrete repair............................... 3.4.8
Watertightness ............................................. 3.1.3.4
Erosion .............................................................. 1.5.3
Workability ................................................... 3.1.3.1
Erosion-corrosion .............................................. 7.1.2
Copper alloys, steel substitute............................ 7.4.1.3
Excavations ....................................................... 1.7.5
Corrosion........................................................... 1.5.3
Fender piles
Cathodic protection....................................... 7.3.1
Repair .......................................................... 2.3.2.4
CelI .............................................................. 7.1.1
Replacement ................................................ 2.3.1.9
Definition ...................................................... 7.1.1
Fenders, protection ............................................ 1.8.5
Inhibitive pigments........................................ 7.2.1
Fiberglass construction
Products, chemical analysis.......................... 7.5.2.6
Filament winding method.............................. 8.2.3
Steel-reinforced concrete .............................. 3.2.1.4
Lay-up method ............................................. 8.2.1
Cracks, timber ................................................... 2.1.6
Spray-up method .......................................... 8.2.2
Crane trackage .................................................. 1.4.2.7
Fiberglass-reinforced plastic structures .............. 8.1.1
Creosote, preservative ....................................... 2.1.3
Fiber-reinforced concrete ................................... 3.1.4.2
Crustaceans ...................................................... 2.1.2.2
Fire curtain walls
Curb, preservative.............................................. 2.1.4.8
Preservatives................................................ 2.1.4.1
Currents............................................................. 1.8.7
Replacement ................................................ 2.3.1.8
Decking
Floating drydock, definition ................................ 1.4.2.5.2
Preservatives................................................ 2.1.4.10
Fleet mooring, definition..................................... 1.4.2.4
Replacement ................................................ 2.3.1.7
Floating steel pontoons, inspection .................... 7.5.3.2
Degree-of-hazard
Floating steel structures
Definition ...................................................... 1.4.1.1
Inspection..................................................... 7.5.3.7
Field measurements ..................................... 1.6.1
Repair .......................................................... 7.6.7
Deterioration
Foamed plastic structures .................................. 8.1.2
Causes ......................................................... 1.5.3
Foaming-in-place, urethane foam....................... 8.2.4
Concrete....................................................... 3.2.1
Fungi
Differential environmental corrosion ................... 7.1.2
Definition ...................................................... 2.1.2.1
Divers
Deterioration................................................. 1.5.3
Maintenance ................................................. 1.7.1
Timber structures ......................................... 2.1.1
Timber inspection ......................................... 2.2.2
Galvanic anode system. cathodic protection...... 7.3.2
Dolosse (concrete armor units) .......................... 5.1.3
Galvanic corrosion............................................. 7.1.2
Dolphin
Gas distribution system, inspection.................... 7.5.3.4.5
Definition ...................................................... 1.4.2.3
Granite, graving docks ....................................... 4.1.2
Protection ..................................................... 1.8.5
Graving dock, definition ..................................... 1.4.2.5.1
Replacement ................................................ 2.3.1.11
Gribble .............................................................. 2.1.2.2
Dry abrasive blasting (steel)............................... 7.2.2
Groins
Drydock
Definition ...................................................... 1.4.2.10
Inspection..................................................... 7.5.3.6
Structural damage (rubble-mound) ............... 5.2.2.2
Repair .......................................................... 7.6.6
Grouting ............................................................ 4.3.5
Drypack mortar, concrete repair ......................... 3.4.2
Hardware, timber structures ............................... 2.1.7
Dry rot, timber.................................................... 2.1.2.1
H-piling, repair ................................................... 7.6.2.1
Electric power transmission/distribution
Hotwater distribution system, inspection ............ 7.5.3.4.2
system, inspection ........................................ 7.5.3.4.7
Index 2
Impressed current system, cathodic
Marine organisms
protection ..................................................... 7.3.2
Control ......................................................... 1.4.1.4
Inspection
Deterioration................................................. 1.5.3
Barges.......................................................... 1.7.2
Marine railway, definition ................................... 1.4.2.5.3
Definition ...................................................... 1.4.1.1
Martesia striata .................................................. 2.1.2.2
Divers........................................................... 1.7.1
Mechanical damage........................................... 1.5.3
Drydocks ...................................................... 7.5.3.6
Microscopic testing, steel structures................... 7.5.2.5
Electronic (concrete) ..................................... 3.3.3
Mold, timber structures ...................................... 2.1.2.1
Floating steel pontoon structures .................. 7.5.3.2
Mole, definition .................................................. 1.4.2.7
Floating steel structures................................ 7.5.3.7
Mollusks ............................................................ 2.1.2.2
Ladders ........................................................ 1.7.4
Mooring fittings
Mechanical (concrete)................................... 3.3.2
Inspection..................................................... 7.5.3.5
Mooring fittings ............................................. 7.5.3.5
Repair .......................................................... 7.6.5
Protective coatings (steel)............................. 7.2.5
Mound, definition ............................................... 5.1.1
Rafts ............................................................ 1